The Botanist
A maintained knowledge base built from council and commission meetings — updated as new meetings land. Last synced Aug 22, 2026.
Overview
through Jul 19, 2026Proposal at a glance
| Existing | Proposed | |
|---|---|---|
| Use | Surface parking lot (part of WillowWood Office Plaza) | — |
| Floor area | 24,408 sq ft | — |
| Dwelling units | — | 260 |
| Retail | — | 5,000 sq ft |
| Stories | — | 7 |
| Site area | — | 2.96 acres |
Tax map parcel(s): 47 4 02 02 002A1
Extracted from the city's submitted documents; each figure traces to the text it came from.
- Floor area (existing) — "EX. 5-STORY BRICK BUILDING 24,408 SQ. FT."
- Dwelling units (proposed) — "The Project will consist of 260 total units"
- Retail (proposed) — "approximately 5,000 square feet of ground floor retail"
- Stories (proposed) — "7 STORIES/81 FEET OF MULTI-FAMILY - SPECIAL EXCEPTION REQUESTED"
- Site area (proposed) — "GROSS SITE AREA: ±129,130 SF (±2.96 AC)"
Official record
The applicant proposes to replace existing surface parking at WillowWood Office Plaza with a seven story building that consist of up to 260 apartments, approximately 5,000 square feet of ground floor retail, and a parking garage on approximately 2.97 acres. The subject property is located in the Northfax Small Area Plan.
- Requests: The applicant has requested a Zoning Map Amendment (Rezoning) from CR Commercial Retail to CU Commercial Urban in the Architectural Control Overlay District (ACOD), a Special Use Permit for upper story residential/mixed-use building, and Special Exceptions to density, height, 75% ground floor nonresidential use in a mixed use building, setbacks, sidewalks, tree canopy requirement and vehicular cross-access. This land use application is subject to the City's Affordable Dwelling Unit (ADU) ordinance and requires a Major Certificate of Appropriateness for architecture and landscaping.
- Address: 10306 Eaton Place, Fairfax, VA 22030
- Applicant: Capital City Real Estate, LLC Chris Love Managing Partner, Washington DC 3000 K Street NW, Suite 270 Washington, DC 20007
- City record
In this wiki
- Positions & open questions
- Impact analysis — screening estimates with assumptions and ranges
- Documents — the city's published record for this project
Positions & open questions
through Jul 19, 2026Open questions
No unresolved questions recorded.
Member commentary
No recorded member positions yet.
Impact analysis
through Jul 19, 2026Screening-level estimates of the economic and fiscal effects of The Botanist. Figures are decision-support context with named assumptions and sensitivity ranges — not predictions. The full analysis has the interactive assumptions panel and maps; methods documents every formula.
Headline estimates
- metric new-residents unavailable — households x persons per multifamily unit (Rutgers CUPR bedroom-mix multipliers)
- metric annual-capture-project-s-own-ground-floor-retail unavailable — Huff model over individual retail POIs: joint destination+mode choice, P(j,m) ~ A_j * w_m * exp(-b_m t_mj), CES category spend; clusters are a reporting rollup; own retail competes as a destination
- metric new-annual-spending-arriving-on-foot unavailable — walk-mode share of the joint destination+mode Huff choice, summed over businesses; walking loses to driving with walk time, so the remainder of the mode-split budget arrives by car
- metric real-estate-tax-increase unavailable — projected minus current RE tax
- metric net-annual-fiscal-impact-naive-per-capita-method unavailable — incremental new recurring revenue minus service cost (upper-bound cost framing; allocates fixed citywide costs)
- metric net-annual-fiscal-impact-marginal-framing unavailable — incremental new recurring revenue minus service cost (only services that scale with new residents)
Method notes, caveats, and non-headline metrics live on the analysis page.
Documents
through Jul 30, 2026Documents published in the city's project record, in the order the city lists them. Labels are the city's own and usually carry the document date, format, and size.
- June 21, 2024 Statement of Support (PDF, 204KB)
- June 21, 2024 General Development Plan (PDF, 74MB)
- June 21, 2024 Proffers (PDF, 163KB)
- March 29, 2024 Statement of Support (PDF, 283KB)
- March 29, 2024 General Development Plan (PDF, 34MB)
- March 29, 2024 N29 Willowwood Plaza Traffic Impact Study (PDF, 4MB)
- March 29, 2024 Willowwood Plaza Parking Reduction Study (PDF, 2MB)
- March 29, 2024 N29 Retail Study (PDF, 9MB)
- March 29, 2024 Proffers (PDF, 163KB)
- January 24, 2024 Statement of Support (PDF, 106KB)
- January 24, 2024 General Development Plan (PDF, 43MB)
- January 24, 2024 N29 Willowwood Plaza Traffic Impact Study (PDF, 4MB)
- January 24, 2024 Willowwood Plaza Parking Reduction Study (PDF, 1MB)
- January 24, 2024 Draft Proffers (PDF, 99KB)
- January 24, 2024 Survey (PDF, 7MB)
- December 4, 2023 N29 Residential WillowWood Phase I BAR Submission (PDF, 11MB)
- November 7, 2023 N29 WillowWood Phase I BAR Submission (PDF, 9MB)
- October 16, 2023 Statement of Support (PDF, 105KB)
- October 16, 2023 N29 Residential Phase I General Development Plan (PDF, 28MB)
- October 16, 2023 Certified Plat (PDF, 1MB)
- October 16, 2023 Proffers (PDF, 40KB)
- October 16, 2023 Parking Reduction Study (PDF, 1MB)
- October 16, 2023 Subdivision Analysis Exhibit (PDF, 1013KB)
- August 14, 2023 N29 Residential Willowwood Phase I Statement of Support (PDF, 107KB)
- August 14, 2023 N29 Residential Willowwood Phase I General Development Plan Pages 1-10 (PDF, 18MB)
- August 14, 2023 N29 Residential Willowwod Phase I General Development Plan Pages 11-20 (PDF, 15MB)
- August 14, 2023 N29 Residential Willowwood Phase I General Development Plan Pages 21-30 (PDF, 16MB)
- August 14, 2023 N29 Residential Willowwood Phase I General Development Plan Pages 31-37 (PDF, 26MB)
- August 14, 2023 Willowwood Plaza Traffic Impact Study (PDF, 4MB)
- August 14, 2023 N29 Residential Willowwood Phase I Parking Reduction Study (PDF, 7MB)
- August 14, 2023 N29 Residential Willowwood Phase I Proffers (PDF, 39KB)
- May 23, 2023 N29 WillowWood Phase I BAR Submission (PDF, 26MB)
- May 1, 2023 N29 Residential Statement of Support (PDF, 260KB)
- May 1, 2023 N29 Residential General Development Plan Sheets 1-10 (PDF, 14MB)
- May 1, 2023 N29 Residential General Development Plan Sheets 11-18 (PDF, 10MB)
- May 1, 2023 N29 Residential General Development Plan Sheets 19-29 (PDF, 13MB)
- May 1, 2023 N29 Residential General Development Plan Sheets 30-36 (PDF, 21MB)
- May 1, 2023 N29 Residential Traffic Impact Study (PDF, 3MB)
- May 1, 2023 N29 Residential Parking Reduction Study (PDF, 680KB)
- May 1, 2023 Subdivision Analysis Exhibit (PDF, 1MB)
- December 8, 2022 N29 Residential Phase I Land Use Applications (PDF, 601KB)
- December 8, 2022 N29 Residential Phase I Statement of Support (PDF, 75KB)
- December 8, 2022 General Development Plan Sheets 1-9 (PDF, 13MB)
- December 8, 2022 General Development Plan Sheets 10-20 (PDF, 21MB)
- December 8, 2022 General Development Plan Sheets 21-30 (PDF, 17MB)
- December 8, 2022 N29 Residential Willowwood Plaza Parking Reduction Study (PDF, 685KB)
- December 8, 2022 N29 Residential Phase I Future Road Connection Exhibit (PDF, 3MB)
- December 8, 2022 N29 Residential Phase I Subdivision Analysis Exhibit (PDF, 1MB)
- July 22, 2022 N29 Residential Phase I Land Use Applications (PDF, 665KB)
- July 22, 2022 N29 Residential Phase I Statement of Support (PDF, 500KB)
- July 22, 2022 N29 Residential Phase I General Development Plan (PDF, 16MB)
- April 13, 2022 N29 WillowWood Plaza Residential Briefing Letter (PDF, 200KB)
- April 13, 2022 N29 WillowWood Plaza Residential Concept Plan (PDF, 13MB)
- July 9, 2024 City Council Public Hearing (PDF, 20MB)
- April 22, 2024 Planning Commission Public Hearing (PDF, 16MB)
- April 22, 2024 Planning Commission Public Hearing
- February 7, 2024 Board of Architectural Review Public Hearing (PDF, 12MB)
- December 20, 2023 Board of Architectural Review Public Hearing (PDF, 11MB)
- December 20, 2023 Board of Architectural Review Public Hearing Video
- November 15, 2023 Board of Architectural Review Work Session (PDF, 9MB)
- November 15, 2023 Board of Architectural Review Work Session Video
- June 27, 2023 City Council Post-Submission Work Session (PDF, 20MB)
- June 27, 2023 City Council Post-Submission Work Session Video
- June 21, 2023 Board of Architectural Review Work Session (PDF, 28MB)
- June 12, 2023 Planning Commission Post-Submission Work Session (PDF, 2MB)
- June 12, 2023 Planning Commission Post-Submission Work Session Video
- April 25, 2022 Planning Commission Pre-Application Briefing (PDF, 11MB)
- April 25, 2022 Planning Commission Pre-Application Briefing Video
- May 10, 2022 City Council Pre-Application Briefing (PDF, 14MB)
- May 10, 2022 City Council Pre-Application Briefing Video
Page history
Log
2026-07-19
- Seeded from the tracker profile and official records.
2026-07-28
- Pipeline refresh.
- Pipeline refresh.
- Pipeline refresh.
2026-07-30
- Pipeline refresh.
2026-08-22
- Pipeline refresh.