← Chain Bridge Road Pedestrian and Bus Stop Improvements
Wiki · beta
Chain Bridge Road Pedestrian and Bus Stop Improvements
A maintained knowledge base built from council and commission meetings — updated as new meetings land. Last synced Aug 4, 2026.
Overview
through Jul 19, 2026Official record
This project will build 1,850 feet of sidewalk and improve bus stops along Chain Bridge Road (Route 123) between Taba Cove and Warwick Ave, enhancing pedestrian access and bus stop facilities.
- Address: Taba Cove to Warwick Ave, Fairfax, VA 22030
- City record
In this wiki
- Positions & open questions
- Documents — the city's published record for this project
Positions & open questions
through Jul 19, 2026Open questions
No unresolved questions recorded.
Member commentary
No recorded member positions yet.
Documents
through Aug 4, 2026Documents published in the city's project record, in the order the city lists them. Labels are the city's own and usually carry the document date, format, and size.
- 07_29_26_Pop-Up-Information-Session-Handout.pdf (PDF, 1MB)
- Chain Bridge Road Sidewalk and Bus Stop Improvements 60% Plans
- Chain Bridge Road Sidewalk and Bus Stop Improvement Concept Plan Exhibit 1 (April 10, 2020) (PDF, 9MB)
- Chain Bridge Road Sidewalk and Bus Stop Improvement Concept Plan Exhibit 2 (April 10, 2020) (PDF, 10MB)
- Chain Bridge Road Sidewalk and Bus Stop Improvement Concept Plan Exhibit 3 (April 10, 2020) (PDF, 11MB)
- Chain Bridge Road Sidewalk and Bus Stop Improvement Exhibit (March 23, 2020) (PDF, 6MB)
- Chain Bridge Road and Sidewalk Open House Exhibit (January 17, 2024) (PDF, 5MB)
- Programmatic Categorical Exclusion Finalized (September 22, 2023) (PDF, 322KB)
Page history
Log
2026-07-19
- Seeded from the tracker profile and official records.
2026-07-28
- Pipeline refresh.
- Pipeline refresh.
2026-08-04
- Pipeline refresh.