Skip to content
CouncilHound
Chain Bridge Road Shared Use Path
Wiki · beta

Chain Bridge Road Shared Use Path

A maintained knowledge base built from council and commission meetings — updated as new meetings land. Last synced Aug 22, 2026.

Overview

through Jul 19, 2026

Proposal at a glance

ExistingProposed
Corridor{'length_ft': None, 'facilities': ['shared use path'], 'street_name': 'Chain Bridge Road', 'from_street': 'Assembly Drive', 'to_street': 'Northfax Street'}

Tax map parcel(s): 57 2 18 001 A

Official record

This project will construct a missing link of path on the west side of Chain Bridge Road between Assembly Drive and Northfax Street (formerly Orchard Street).

In this wiki

Positions & open questions

through Jul 19, 2026

Open questions

No unresolved questions recorded.

Member commentary

No recorded member positions yet.

Impact analysis

through Jul 27, 2026

Screening-level estimates of the economic and fiscal effects of Chain Bridge Road Shared Use Path. Figures are decision-support context with named assumptions and sensitivity ranges — not predictions. The full analysis has the interactive assumptions panel and maps; methods documents every formula.

Headline estimates

  • metric annual-trail-user-spending-at-nearby-businesses unavailable — annual user-days x direct spending per user-day (NCDOT four-trail range, destination trails excluded); allocated to businesses by walk-decay Huff from the access points
  • metric annual-real-estate-tax-increment-trail-premium unavailable — property value uplift x RE rate / 100 — recurring only if the premium capitalizes into assessments

Method notes, caveats, and non-headline metrics live on the analysis page.

Page history

Log

2026-07-19

  • Seeded from the tracker profile and official records.

2026-07-27

  • Pipeline refresh.

2026-07-28

  • Pipeline refresh.
  • Added impact analysis from the synthesized evaluation.
  • Pipeline refresh.
  • Pipeline refresh.

2026-08-22

  • Pipeline refresh.