City Centre West
A maintained knowledge base built from council and commission meetings — updated as new meetings land. Last synced Aug 22, 2026.
Overview
through Jul 19, 2026Proposal at a glance
| Existing | Proposed | |
|---|---|---|
| Use | Three existing freestanding buildings: a vacant drive-through bank, a vacant restaurant, and a low-rise office building | — |
| Floor area | 19,469 sq ft | — |
| Dwelling units | 0 | 79 |
| Affordable units | — | 5 |
| Retail | — | 7,731 sq ft |
| Office | — | 36,862 sq ft |
| Stories | — | 8 |
| Parking spaces | — | 309 |
| Site area | — | 1.78 acres |
Tax map parcel(s): 57 4 02 076, 57 4 02 072, 57 4 02 071
Extracted from the city's submitted documents; each figure traces to the text it came from.
- Floor area (existing) — "vacant 3,721 SF bank, a vacant 4,408 SF restaurant, and 11,340 SF of office"
- Dwelling units (existing) — "The Subject Property is currently developed with three existing freestanding buildings"
- Dwelling units (proposed) — "Multifamily residential up to a maximum of seventy-nine (79) for-sale condominium dwelling units."
- Affordable units (proposed) — "five (5) units, representing 6% of the total number of units"
- Retail (proposed) — "Approximately 7,731 square feet of ground floor retail and/or restaurant uses."
- Office (proposed) — "Approximately 36,862 square feet of non-retail/restaurant commercial floor area"
- Stories (proposed) — "a height of eight (8) stories and approximately 94 feet"
- Parking spaces (proposed) — "a partially buried 4-level parking garage that includes a total of 309 parking spaces"
- Site area (proposed) — "Subject Property includes a total of approximately 77,683 square feet (approximately 1.78 acres)"
Official record
The applicant is proposing to replace a former bank with a drive-through, a former restaurant, and an existing low-rise office building with an upper-story residential/mixed use building with 79 multifamily condominium units, medical and general office space, a bank with a drive-through, and ground floor retail and/or restaurant uses on approximately 1.78 acres. The subject property is located in the Transition Overlay District and the Architecture Control Overlay District.
- Requests: The applicant is requesting a Zoning Map Amendment (Rezoning) from CR Commercial Retail and CG Commercial General to CU Commercial Urban in the Old Town Transition Overlay District to allow the construction of an upper story residential/mixed use building; a Special Use Permit to permit a drive-through bank facility; and, Special Exceptions to density, height, mandatory build-to line and maximum front yard, inter-parcel vehicular access, maximum street tree spacing and tree canopy coverage. This application is subject to the City's Affordable Dwelling Unit (ADU) ordinance and will require a Major Certificate of Appropriateness.
- Address: 10501 Main Street, Fairfax, VA 22030
- Applicant: Ox Hill Realty, LLC Robert D. Brant, Attorney Walsh, Colucci, Lubeley & Walsh, PC
- City record
In this wiki
- Positions & open questions
- Impact analysis — screening estimates with assumptions and ranges
- Documents — the city's published record for this project
Positions & open questions
through Jul 19, 2026Open questions
No unresolved questions recorded.
Member commentary
No recorded member positions yet.
Impact analysis
through Jul 19, 2026Screening-level estimates of the economic and fiscal effects of City Centre West. Figures are decision-support context with named assumptions and sensitivity ranges — not predictions. The full analysis has the interactive assumptions panel and maps; methods documents every formula.
Headline estimates
- metric new-residents unavailable — households x persons per multifamily unit (Rutgers CUPR bedroom-mix multipliers)
- metric annual-capture-project-s-own-ground-floor-retail unavailable — Huff model over individual retail POIs: joint destination+mode choice, P(j,m) ~ A_j * w_m * exp(-b_m t_mj), CES category spend; clusters are a reporting rollup; own retail competes as a destination
- metric new-annual-spending-arriving-on-foot unavailable — walk-mode share of the joint destination+mode Huff choice, summed over businesses; walking loses to driving with walk time, so the remainder of the mode-split budget arrives by car
- metric real-estate-tax-increase unavailable — projected minus current RE tax
- metric net-annual-fiscal-impact-naive-per-capita-method unavailable — incremental new recurring revenue minus service cost (upper-bound cost framing; allocates fixed citywide costs)
- metric net-annual-fiscal-impact-marginal-framing unavailable — incremental new recurring revenue minus service cost (only services that scale with new residents)
Method notes, caveats, and non-headline metrics live on the analysis page.
Documents
through Jul 30, 2026Documents published in the city's project record, in the order the city lists them. Labels are the city's own and usually carry the document date, format, and size.
- July 3, 2023 Narrative (PDF, 232KB)
- July 3, 2023 General Development Plan Sheets 1-26 (PDF, 18MB)
- July 3, 2023 General Development Plan Sheets 27-54 (PDF, 20MB)
- July 3, 2023 Proffers (PDF, 176KB)
- July 3, 2023 Transportation Impact Study (PDF, 22MB)
- July 3, 2023 Transportation Impact Study Technical Appendix (PDF, 12MB)
- June 13, 2023 BAR Sheets 1-8 (PDF, 10MB)
- June 13, 2023 BAR Sheets 9-15 (PDF, 15MB)
- June 13, 2023 BAR Sheets 16-23 (PDF, 28MB)
- June 13, 2023 BAR Sheets 24-28 (PDF, 2MB)
- June 13, 2023 BAR Sheets 29-63 (PDF, 4MB)
- June 13, 2023 BAR Sheets 64-107 (PDF, 13MB)
- June 5, 2023 Narrative (PDF, 369KB)
- June 5, 2023 General Development Plan Sheets 1-13 (PDF, 11MB)
- June 5, 2023 General Development Plan Sheets 14-22 (PDF, 7MB)
- June 5, 2023 General Development Plan Sheets 23-33 (PDF, 10MB)
- June 5, 2023 General Development Plan Sheets 34-40 (PDF, 9MB)
- June 5, 2023 General Development Plan Sheets 41-46 (PDF, 4MB)
- June 5, 2023 General Development Plan Sheets 47-52 (PDF, 12MB)
- June 5, 2023 Proffers (PDF, 365KB)
- June 5, 2023 Transportation Impact Study (PDF, 23MB)
- June 5, 2023 Transportation Impact Study Technical Appendix (PDF, 12MB)
- May 11, 2023 BAR Submission 2 Sheets 1-22 (PDF, 21MB)
- May 11, 2023 BAR Submission 2 Sheets 23-58 (PDF, 4MB)
- May 11, 2023 BAR Submission 2 Sheets 59-73 (PDF, 4MB)
- May 11, 2023 BAR Submission 2 Sheets 74-95 (PDF, 5MB)
- April 24, 2023 Narrative (PDF, 200KB)
- April 24, 2023 General Development Plan 1-22 (PDF, 18MB)
- April 24, 2023 General Development Plan 23-34 (PDF, 12MB)
- April 24, 2023 General Development Plan 35-50 (PDF, 21MB)
- April 24, 2023 Transportation Impact Study (PDF, 23MB)
- April 24, 2023 Fiscal Impact Analysis (PDF, 761KB)
- October 24, 2022 BAR Submission 1 (PDF, 7MB)
- September 1, 2022 Narrative (PDF, 203KB)
- September 1, 2022 Master Development Plan Sheet 1-21 (PDF, 17MB)
- September 1, 2022 Master Development Plan Sheet 22-36 (PDF, 27MB)
- September 1, 2022 Fiscal Impact Analysis (PDF, 2MB)
- January 24, 2022 Narrative (PDF, 200KB)
- January 24, 2022 Master Development Plan (PDF, 29MB)
- January 24, 2022 Certified Plat (PDF, 448KB)
- January 24, 2022 Fiscal Impact Analysis Report (PDF, 4MB)
- March 18, 2019 Fairfax City Center West Summary (PDF, 139KB)
- March 18, 2019 Conceptual Site Plan (PDF, 3MB)
- July 11, 2023 City Council Public Hearing (PDF, 3MB)
- July 11, 2023 City Council Public Hearing Video
- June 26, 2023 Planning Commission Public Hearing (PDF, 3MB)
- June 26, 2023 Planning Commission Public Hearing Video
- June 21, 2023 Board of Architectural Review Public Hearing (PDF, 30MB)
- May 17, 2023 Board of Architectural Review Work Session 2
- May 17, 2023 Board of Architectural Review Work Session 2 Video
- November 15, 2022 City Council Post-Submission Work Session
- November 15, 2022 City Council Post-Submission Work Session Video
- November 2, 2022 Board of Architectural Review Work Session 1 (PDF, 9MB)
- November 2, 2022 Board of Architectural Review Work Session 1 Video
- October 24, 2022 Planning Commission Post-Submission Work Session (PDF, 1MB)
- October 24, 2022 Planning Commission Post-Submission Work Session Video
- April 22, 2019 Planning Commission Work Session (PDF, 4MB)
- April 22, 2019 Planning Commission Work Session Video
- April 2, 2019 City Council Work Session (PDF, 110KB)
- April 2, 2019 City Council Work Session Video
Page history
Log
2026-07-19
- Seeded from the tracker profile and official records.
2026-07-28
- Pipeline refresh.
- Pipeline refresh.
- Pipeline refresh.
2026-07-30
- Pipeline refresh.
2026-08-22
- Pipeline refresh.