Fairfax Square
A maintained knowledge base built from council and commission meetings — updated as new meetings land. Last synced Aug 22, 2026.
Overview
through Jul 19, 2026Proposal at a glance
| Existing | Proposed | |
|---|---|---|
| Use | 12 existing commercial buildings comprising office, medical, personal services, retail, and church uses | — |
| Floor area | 126,535 sq ft | — |
| Dwelling units | 0 | 138 |
| Affordable units | — | 11 |
| Retail | — | 59,000 sq ft |
| Office | — | 70,906 sq ft |
| Stories | — | 5 (medium confidence) |
| Site area | — | 10.47 acres |
Tax map parcel(s): 58 3 02 013 C, 58 3 02 013 A, 48 3 14 002 B
Extracted from the city's submitted documents; each figure traces to the text it came from.
- Floor area (existing) — "12 existing buildings with 126,535 square feet of a variety of commercial uses"
- Dwelling units (existing) — "features 12 existing buildings with 126,535 square feet of a variety of commercial uses"
- Dwelling units (proposed) — "comprising a total of 138 residential units across the Property"
- Affordable units (proposed) — "Applicant shall construct a minimum of eleven (11) units within the first multifamily building"
- Retail (proposed) — "up to 59,000 square feet of new commercial uses"
- Office (proposed) — "retention of 70,906 square feet of office and commercial space in two buildings"
- Stories (proposed) — "retain the existing five-story office building at 9900 Main Street"
- Site area (proposed) — "located on 10.47 acres at the end of Burke Station Road"
Official record
The Applicant proposes a phased mixed-use development that would retain the existing five-story office building at 9900 Main Street and the existing bank at 9910 Main Street, while adding four new commercial buildings along Main Street and two residential buildings with 48 townhomes to the rear of the property for a total of 138 units. The Applicant is also proposing 11 affordable units.
- Requests: The Applicant requests a Comprehensive Plan Amendment, Zoning Map Amendment (Rezoning), Master Development Plan with modifications, and a Major Certificate of Appropriateness for architecture and landscaping.
- Address: 9840-9946 Main Street, Fairfax, VA 22030
- Applicant: Van Metre Companies 9900 Main Street, Suite 500 Fairfax, VA 22031
- City record
In this wiki
- Meeting history — every action, vote, and update, with links to the moment in the meeting video
- Positions & open questions
- Impact analysis — screening estimates with assumptions and ranges
- Documents — the city's published record for this project
Meeting history
through Sep 9, 20252025-07-14 — Planning Commission Regular Meeting/Work Session
Agenda item 8a: Work Session: Pre-application briefing for a proposed mixed-use development at Fairfax Square Professional Center, 9840–9946 Main Street (watch the moment)
- Outcome: Staff presented a pre-application briefing on the proposed mixed-use development; no formal action taken during the work session.
- [8a] A pre-application briefing was presented to the Planning Commission for a proposed mixed-use development at the Fairfax Square Professional Center located at 9840–9946 Main Street; no formal action was taken.
- Status after: proposed
2025-09-09 — City Council Meeting
Agenda item 11a: Work Session: Pre-Application Briefing on Fairfax Square Professional Center (9840-9946 Main Street)
- Outcome: Briefing presented to Council during work session. No formal action taken.
- [11a] Pre-application briefing on the Fairfax Square Professional Center at 9840–9946 Main Street was presented to Council during the work session; no formal action taken.
- Status after: proposed
Positions & open questions
through Jul 19, 2026Open questions
No unresolved questions recorded.
Member commentary
No recorded member positions yet.
Impact analysis
through Jul 19, 2026Screening-level estimates of the economic and fiscal effects of Fairfax Square. Figures are decision-support context with named assumptions and sensitivity ranges — not predictions. The full analysis has the interactive assumptions panel and maps; methods documents every formula.
Headline estimates
- metric new-residents unavailable — households x persons per multifamily unit (Rutgers CUPR bedroom-mix multipliers)
- metric annual-capture-project-s-own-ground-floor-retail unavailable — Huff model over individual retail POIs: joint destination+mode choice, P(j,m) ~ A_j * w_m * exp(-b_m t_mj), CES category spend; clusters are a reporting rollup; own retail competes as a destination
- metric new-annual-spending-arriving-on-foot unavailable — walk-mode share of the joint destination+mode Huff choice, summed over businesses; walking loses to driving with walk time, so the remainder of the mode-split budget arrives by car
- metric real-estate-tax-increase unavailable — projected minus current RE tax
- metric net-annual-fiscal-impact-naive-per-capita-method unavailable — incremental new recurring revenue minus service cost (upper-bound cost framing; allocates fixed citywide costs)
- metric net-annual-fiscal-impact-marginal-framing unavailable — incremental new recurring revenue minus service cost (only services that scale with new residents)
Method notes, caveats, and non-headline metrics live on the analysis page.
Documents
through Jul 30, 2026Documents published in the city's project record, in the order the city lists them. Labels are the city's own and usually carry the document date, format, and size.
- Statement-of-Support.pdf (PDF, 716KB)
- Master-Development-Plan.pdf (PDF, 59MB)
- Draft-Commitments.pdf (PDF, 2MB)
- Fairfax-Square-Briefing-Submission.pdf (PDF, 23MB)
- City-Council-Briefing.pdf (PDF, 25MB)
- City Council Briefing Video
- Planning-Commission-Briefing.pdf (PDF, 23MB)
- Planning Commission Briefing Video
Page history
Log
2026-07-19
- Seeded from the tracker profile and official records.
2026-07-28
- Pipeline refresh.
- Pipeline refresh.
- Pipeline refresh.
2026-07-30
- Pipeline refresh.
2026-08-04
- Meeting history updated through 2025-09-09.
2026-08-22
- Meeting history updated through 2025-09-09.