Development project
Northfax West, as pictured in the city's project record

Northfax West

Under Construction

Private Development · 3570 Chain Bridge Road, Fairfax, VA 22030 · topic history · city record ↗ · on the map

A maintained knowledge base built from council meetings and official records — updated as new meetings land. Last synced Oct 7, 2026.

Overview

through Sep 1, 2026
AI-curatedNot yet reviewedMay have changed at the Oct 13 meeting

Proposal at a glance

ExistingProposed
UseTwo one-story houses (RM parcels), vehicle storage lot, existing restaurant, and vacant/undeveloped land; site currently zoned CR (Commercial Retail) and RM (Residential Medium)—
Dwelling units2—
Retail—25,000 sq ft (medium confidence)
Parking spaces—260 (medium confidence)
Site area—11.46 acres

Tax map parcel(s): 57 2 47 001, 57 2 52 056, 57 2 52 000 B, 57 2 52 000 A, 57 2 52 055, 57 2 52 054, 57 2 52 053, 57 2 52 052, 57 2 52 051, 57 2 52 050, 57 2 52 049, 57 2 52 048, 57 2 52 047, 57 2 52 046, 57 2 52 045, 57 2 52 044, 57 2 52 043, 57 2 52 042, 57 2 52 041, 57 2 52 040, 57 2 52 027, 57 2 52 028, 57 2 52 029, 57 2 52 030, 57 2 52 031, 57 2 52 032, 57 2 52 033, 57 2 52 034, 57 2 52 035, 57 2 52 039, 57 2 52 038, 57 2 52 037, 57 2 52 017, 57 2 52 018, 57 2 52 019, 57 2 52 020, 57 2 52 021, 57 2 52 022, 57 2 52 023, 57 2 52 024, 57 2 52 025, 57 2 52 026, 57 2 52 036, 57 2 52 001, 57 2 52 002, 57 2 52 003, 57 2 52 004, 57 2 52 005, 57 2 52 006, 57 2 52 007, 57 2 52 008, 57 2 52 009, 57 2 52 010, 57 2 52 011, 57 2 52 012, 57 2 52 013, 57 2 52 014, 57 2 52 015, 57 2 52 016, 57 2 52 00A1

Extracted from the city's submitted documents; each figure traces to the text it came from.

  • Dwelling units (existing) — "two (2) one-story houses located on the RM portion of the Subject Property"
  • Retail (proposed) — "approximately 25,000 square feet of office, retail, and restaurant uses"
  • Parking spaces (proposed) — "minimum of 126 parking spaces shall be constructed in conjunction with Phase Three"
  • Site area (proposed) — "comprise approximately 11.46 acres and are identified as Tax Map 57-2-02-003"

Official record

Informational development briefings were held on January 7, 2020 for City Council and January 13, 2020 for Planning Commission to discuss a proposal for mixed-use planned development on 11.32 +/- acres. The applicant is proposing 56 townhouses, 200 unit senior living facility (multifamily and congregate living facility) with structured parking, culvert on-site stream, disturbance in floodplain and Resource Protection Area, and road construction by the City and applicant in Phase I. The applicant has an undetermined mix of future uses along Chain Bridge Road and a future access road from Chain Bridge Road in Phase II. Work sessions to review the submitted applications were held by the Planning Commission on May 11, 2020 and the City Council on May 13, 2020. The proposed culvert would be approximately 970 linear feet long and would impact 1,646 linear feet of stream channel. This proposal has received permits from state and federal agencies, including a Virginia Water Protection Individual Permit (18-1003) from the Virginia Department of Environmental Quality (VDEQ) and a State Program General Permit (17- SPGP-01) from the US Army Corps of Engineers (USACE). In addition to the USACE and VDEQ, the proposal is reviewed by the US Environmental Protection Agency, US Fish & Wildlife Service, Virginia Marine Resources Commission, Virginia Department of Game and Inland Fisheries, Virginia Department of Conservation and Recreation, and Virginia Department of Health. The findings from these reviews concluded that compliance with the approved permitting process: Will protect instream beneficial uses, will not violate applicable water quality standards, and will not cause or contribute to a significant impairment of state waters or fish and wildlife resources The approved permit requires compensation for the stream impacts through the purchase of stream credits (or stream condition units) from a VDEQ approved mitigation bank. During the permitting process, the City of Fairfax requested that instead of the purchase of stream credits from a VDEQ bank, that a compensatory mitigation project be completed on a stream located in the City. The VDEQ responded to the City's request stating that the purchasing of credits is the ecologically preferred form of mitigation. Despite this response from VDEQ, the applicant agreed to complete a stream restoration project on approximately 2,190 linear feet of the stream located in the City's Van Dyck Park, or an alternative location on other City property with equal length, accessibility and stream condition, in addition to the purchase of stream credits. A tree canopy of 13.5% of the site, or approximately 1.4 acres, is proposed. The majority of the proposed canopy coverage would be achieved through tree preservation. Proposed vegetation would include native species to the greatest extent possible. In additional to the on-site planting, trees would also be planted within the street rights-of-way. The proposal also received a Conditional Letter of Map Revision from the US Federal Emergency Management Agency on April 1, 2019 for impacts to the floodplain.

  • Requests: Rezoning from RM Residential Medium and CR Commercial Retail to PD-M Planned Development-Mixed Use Approval of Master Development Plan Special Use Permit culvert on-site stream and remove the 100-year floodplain Special Exception for disturbance of Resource Protection Area to build culvert Vacation of a portion of the right-of-way and dedicate a new right-of-way Certificate of Appropriateness of Architecture and Landscaping
  • Address: 3570 Chain Bridge Road, Fairfax, VA 22030
  • Applicant: Northfax JV, LLC
  • City record

A pre-application briefing on Phase IV was held at the City Council work session on September 1, 2026. The Phase IV proposal describes up to 350 multifamily units, ground-floor commercial space, and structured and surface parking at 3570 Chain Bridge Road. No formal vote was recorded (2026-09-01 City Council Work Session).

Meeting history

through Sep 1, 2026
From the recordNot yet reviewedMay have changed at the Oct 13 meeting

2026-09-01 — City Council Work Session

Agenda item 1c: Pre-Application Briefing – Potential Redevelopment of Northfax West (Phase IV), 3570 Chain Bridge Road (watch the moment)

  • Outcome: Pre-application briefing held; no formal vote recorded.
  • [1c] Council received a pre-application briefing on Northfax West Phase IV, which proposes up to 350 multifamily units, ground-floor commercial space, and structured and surface parking at 3570 Chain Bridge Road.
  • Status after: proposed

Positions & open questions

through Sep 1, 2026
AI-curatedNot yet reviewedMay have changed at the Oct 13 meeting

Open questions

  • What is the final unit count, commercial square footage, and parking configuration for Phase IV? (2026-09-01 City Council Work Session)
  • Will a formal application for Phase IV be submitted, and on what timeline? (2026-09-01 City Council Work Session)

Member commentary

No recorded member positions yet.

Impact analysis

through Jul 30, 2026
From the recordNot yet reviewed

Screening-level estimates of the economic and fiscal effects of Northfax West. Figures are decision-support context with named assumptions and sensitivity ranges — not predictions. The full analysis has the interactive assumptions panel and maps; methods documents every formula.

Headline estimates

  • Real estate tax increase: −$1.1M (range −$1.1M – −$1.1M) — projected minus current RE tax

Method notes, caveats, and non-headline metrics live on the analysis page.

Full impact analysis →

Page history

Log

2026-07-19

  • Seeded from the tracker profile and official records.

2026-07-28

  • Pipeline refresh.
  • Pipeline refresh.

2026-07-30

  • Added impact analysis from the synthesized evaluation.
  • Pipeline refresh.

2026-08-22

  • Pipeline refresh.

2026-09-12

  • Meeting history updated through 2026-09-01.
  • Added Phase IV pre-application briefing (2026-09-01 City Council Work Session) to official record and opened questions on Phase IV unit count/timeline. (curator: claude-sonnet-4-6, through 2026-09-01)

2026-09-19

  • Meeting history updated through 2026-09-01.

Impact figures shown on this page resolve live from the current evaluation — wiki text never carries stale numbers.