Loading the briefing…
Loading the briefing…
Every transcribed word and agenda item, with links to the moment on video.
11 passages for “Wilcoxon Trail Extension” in City Council meetings
Wilcoxon Trail Extension Connectivity Study Briefing. Mayor and Council gave consensus to move forward with a feasibility study of the proposed alignment modification using already-appropriated City funds, and to initiate public outreach on the updated concept.
…orge schneider trail we're looking at ways to make those connections without that project so one of them is through the wilcoxon trail extension that we're talking about and pivoting that project up to draper um and using beach drive we're also talking about and we mentioned it a few minutes ago the idea of putting sha…
… utilize Draper Drive and Beach Drive, and consider a new name for this project. the George Snyder Trail extension, the Wilcoxon Trail extension. So again we would utilize that south, the southern part, that southern leg would not change, just that northern leg would rotate up to utilize Draper Drive. This project adhe…
…er, our Multimodal Transportation Planner, and David Summers, our Public Works Director. and we are here to discuss the Wilcoxon Trail Extension, formerly known as George Snyder Trail Extension, not to be confused with the George Snyder Trail. And I will give some project context and then proceed to discuss that, to di…
Our first item is a Wilcoxon Trail Extension Connectivity Study Briefing. I'm going to recognize Wendy Sanford, our Transportation Director, for the staff presentation. Thank
all right we also have scheduled on the 26th the Wilcoxon trail extension briefing which we've talked about and then we have the discussion for code of ethics scheduled for that evening second we're going to have a presentation from Katherine Johnson middle school students will be discussing for later consent the grant…
we supported for years. Interestingly, we have a public hearing on the keeping of up to four chickens for the 26th, and then a work session on, I can go right through this, it's late at night, on Wilcoxon Trail Extension briefing, and then the discussion on Cote of Ethics.
thank you miss sanford mayor council the first one we will talk about is the wilcox and trail extension formerly known as the george snyder trail extension so if a little bit of very quick background is is looking here as the george center trail extension project we made it through i guess the the green step through th…
So as I mentioned, I'm just going to spend a couple of minutes speaking to the original project design. It was originally designed to connect, again, the Wilcoxon trailhead on Fairfax Boulevard and the eastern terminus of the George Snyder Trail. And it was designed as a 10-foot wide shared use path along Route 50, abo…
There's a Wawa kind of near where the Wilcoxon Trail lets out, and that's it. I mean, if you go through those woods, there's not much else until, I mean, unless
As another little thought, there are also alternatives for connecting to the Wilcoxon trails as funds permit, such as extending the bikeway along Fairfax Boulevard, the western portion, or by using Cardinal Road through Draper Drive Park to Beach Drive to Fairfax Boulevard, not by tearing up people's front yards and si…