Anthony Coleman
Willard-Sherwood Community Center
The Willard-Sherwood Health and Community Center is a joint City of Fairfax and Fairfax County redevelopment project at 3740 and 3750 Blenheim Boulevard, replacing the existing Willard Health Center with a new health, wellness, and recreation facility connected via bridge to the existing Stacy C. Sherwood Community Center.
- Oct 27, 2025Planning Commission · item 10Staff Report
Commissioner Coleman has resigned from the Planning Commission; his position on the Façade Improvement Grant Committee will need to be filled.
Courthouse Plaza
Courthouse Plaza (10300 Willard Way, and later also 3922 Blenheim Boulevard) is a shopping center redevelopment project in the City of Fairfax, pursued by Combined Courthouse, LLC. The project has gone through two distinct application cycles.
- Oct 27, 2025Planning Commission · item 10Staff Report
Commissioner Coleman has resigned from the Planning Commission; his position on the Façade Improvement Grant Committee will need to be filled.
George Snyder Trail
The George Snyder Trail (GST) was a planned shared-use trail project (VDOT UPC 112816) in Fairfax City intended to improve multimodal connectivity. The project had received approximately $20.6 million in concessionaire (Transform 66 Outside the Beltway) funding, with a total budget of roughly $16 million remaining after prior expenditures.
- Oct 27, 2025Planning Commission · item 10Staff Report
Commissioner Coleman has resigned from the Planning Commission; his position on the Façade Improvement Grant Committee will need to be filled.
The City of Fairfax's Solid Waste Management Plan (SWMP) 5-Year Update is a long-term planning document covering a twenty-year horizon, required by state code to be updated every five years; the previous update was completed in 2021. The update process was underway as of July 2025, with community engagement including a public meeting held November 20, 2025, at Katherine Johnson Middle School and a community survey on recycling and waste reduction open through the end of 2025.
- Oct 27, 2025Planning Commission · item 10Staff Report
Commissioner Coleman has resigned from the Planning Commission; his position on the Façade Improvement Grant Committee will need to be filled.
The Fairfax Circle Small Area Plan is one of four Activity Center Small Area Plans developed by the City of Fairfax, covering redevelopment and transportation vision for the Fairfax Circle area. Plan development began in Spring 2023.
- Oct 27, 2025Planning Commission · item 10Staff Report
Commissioner Coleman has resigned from the Planning Commission; his position on the Façade Improvement Grant Committee will need to be filled.
- Jan 13, 2025Planning Commission · item 5bAppointments to boards and commissions
Anthony Coleman was nominated by Mr. Cunningham, seconded by Mr. Denton, and elected as the planning commission representative to the Façade Interior Improvement Program by a vote of 7:0.
passedElection of Anthony Coleman as planning commission representative to the Façade Interior Improvement ProgrampassedElection of Matthew Rice as planning commission representative to the Parks and Recreation Advisory BoardpassedElection of Kevin Denton as planning commission representative to the Board of Architectural Review