Named in discussion

Tracked topics the transcript names that no agenda item is filed under. Their own pages and wikis do not yet record this meeting; the passages below are the only trace.

  • Master Planin progress8 passages, 5m

    “…of those plans in a little bit more detail for the safety action plan, pedestrian master plan, and the Old Town Circulation Study. And then the Old Town Circulation Study is the most detailed of the three plans and so we want to have a more in-depth…”

  • “And the Old Town Small Area Plan, of course, looks to have improvements to walkability and connectivity and improves traffic circulation in Old Town. What these plans don't provide is specific project priorities. And so that's what we're doing with this…”

  • “…safety and safety overall throughout the throughout the city and we so we have the comprehensive plan and we have the bicycle master plan all call for improvements to safety and pedestrian improvements and walkability.”

  • Conflict of Interest4 passages, 2m

    “…correctly, says that members of boards and commissions have the same obligations for conflict of interest as elected members do here. So it's a substantial responsibility. And I'm wondering what has been said beyond just this short paragraph here to our…”

  • Fairfax Circle Small Area Plancompleted3 passages, 2m

    “…project here, and stream corridor improvements are proposed for this area within the Fairfax Circle Small Area Plan. Portions of this segment impact private property, so easements would be required. However, there is the opportunity to improve floodplain…”

  • “…north and south of Old Town with the bike lanes, and we're working on the South Street extension. So all of those projects, again,”

  • Small Area Plansin progress3 passages, 2m

    “…And it's good to see the developers acknowledging that the city has a plan. I think small area plans have really been beneficial in that regard for giving people a concept. And it is a concept, not a blueprint. keep hearing that. But you have to start…”

  • Stormwater Utility3 passages, 1m

    “Which is a part of his credit program for his stormwater utility.”

  • “…so there would be limited access and visibility to a project here however the George George Snyder Trail would provide some visibility it would get close to the stream but not provide direct access to it the fourth project option is also within Mosby Woods…”

  • “…area and behind fire station 33 this project area overlapped with the canceled Country Club Hills connector trail however stream restoration project is not dependent on or related to trail construction as you can see in some of stream are very steep…”

  • Fire Stationin progressonce

    “…and Country Club Hills it's next to the Country Club Hills common area and behind fire station 33 this project area overlapped with the canceled Country Club Hills connector trail however stream restoration project is not dependent on or related to trail…”

  • “option however there is only one public pond it's ashby pond it's currently being retrofit now credit purchases are an alternative however the per credit cost is approximately double what it would cost to generate credits through a stream restoration project…”